09.06.2017
Breakthrough of the Champel tunnel

Marti Tunnelbau AG has reached an impor­tant mile­stone for the rail link Cornavin – Eaux Vives – Anne­masse. This new rail­way line, also known as CEVA line, will link the Geneva train station with the French city of Anne­masse.

Representatives of Geneva, CEVA and the SBB, as well as the com­pa­nies that have parti­ci­pated in the con­struc­tion works cele­bra­ted the break­through of the future 1'631 meters long two-lane railway tunnel. The con­struc­tion works will be com­ple­ted by the end of the year.

 
Marti Gruppe
Seedorffeldstrasse 21
3302 Moosseedorf
+41 31 388 75 75

IT-Support