14.12.2015
REMEDIATION OF THE ARA STEIH SITE IN F-HÜNINGEN

​Approximatively 250'000m³ of pro­duc­tion waste and con­ta­mi­na­ted soil mate­rial are being exca­va­ted and ana­lysed within a pro­tec­tive air­tight enclosure. A part of the soil mate­rial is being cleaned on-site in the soil washing plant BWA or loaded over a sealed con­veyor system on special ships and exploi­ted in ther­mal treat­ment faci­li­ties in Hol­land. Further waste is loa­ded in special con­tai­ners or barrels and trans­por­ted to high-tem­pe­ra­ture com­bustion faci­li­ties.​

www.sanierung-steih.ch

Marti Infra AG

 
Marti Gruppe
Seedorffeldstrasse 21
3302 Moosseedorf
+41 31 388 75 75

IT-Support